The installation of Shell And Tube Heat Exchangers must strictly follow the specifications to ensure their performance and safety.
Before installation, make full preparations, read the technical manual in detail, understand the equipment specifications, weight, size and installation requirements; check the installation site to ensure that there is enough space and it meets safety regulations; prepare the necessary installation tools, materials and lifting equipment, and check carefully.
During installation, the installation height of various valves and instruments should be convenient for operation and observation; there should be space for unloading the tube bundle at the front end, the distance between the head and the wall or roof should not be less than the length of the heat exchanger, and the net width of the operating channel should not be less than 0.8m; the vertical clearance from the highest point of the upper attachment to the lowest point of the building structure should not be less than 0.2m. At the same time, construction should be carried out according to the design drawings and technical requirements, pay attention to the installation sequence and position of the shell and tube bundle, ensure that the connection is tight and leak-free, and do a good job of support and fixation.
After installation, the Shell And Tube Heat Exchanger should be strictly debugged and inspected, the sealing and pressure bearing capacity should be tested, the pipeline system should be flushed and exhausted, and the operating parameters should be adjusted to the optimal state.